Request for Quotes for Installation of Level 2 EV Charging Stations

Three electric vehicle charging stations are lined up outdoors.

 

 Sunnyslope County Water District (District) has a project at the main office to install two EV chargers. The District increasingly focuses on social responsibility and sustainable operations, and the installation of EV chargers for staff and public use has become a strategic goal. The installation of new EV chargers addresses the critical need to reduce gas emissions and provide additional charging infrastructure. This project includes the installation of electrical panels, Charge Point level 2 chargers, breakers, wires, and related electrical equipment, along with the construction of required supporting infrastructure.

Details of the Request For Quotes: 

Request for Quote - Sunnyslope Water District EV Chargers.pdf

Due date to submit the quote is 9/12/2025.